MXU Power Jack Repair Instructions - SNR-7.5.1-W-014

Purpose This work instruction describes the process for replacing the MXU Power Jack. These repair instructions are valid for revision C MXU Digital Centrifuges. Required Equipment * Power Jack Wiring Assembly (Part # 100300) * Phillips Head Screwdriver * Crescent Wrench Summary of Process The repair procedure…

E8 Lid Latch Replacement Instructions - SNR-7.5.1-W-027

Purpose This document describes the procedure for replacing the E8 Lid Latch. These instructions are valid for E8V rev F, E8F rev D, and E8T rev F. Required Equipment * Latch (Part # 100073) * Cam Latch; 1.5” (Part # 100473) * #1 Screwdriver * Loc-Tite Blue 425 * Hios CL-6500 electric driver with #3 Phill…

MXU Motor Control Board Repair Instructions - SNR-7.5.1-W-011

Purpose This work instruction describes the process for replacing the MXU Motor Control Board. These repair instructions are valid for revision C MXU Digital Centrifuges. Required Equipment * Motor Control Board (Part # 100484) * Needle Nose Pliers * Screwdriver Summary of Process The repair procedure invo…

Ready Warm Power Switch - SNR-7.5.1-W-047

Purpose This work instruction describes how to replace the power switch for the Ready Warm Tissue Bath. These instructions are valid for revision 6. Required Equipment * Power Switch (Part # 100099) * 2mm Hex Wrench Summary of Process The repair procedure involves unplugging the unit, removing the screws, rep…

MX12 Fuse Replacement Instructions - SNR-7.5.1-W-036

Purpose This work instruction describes the process of replacing the Fuse on the MX12 centrifuges. Required Equipment * The full list of required equipment is not available in the provided document content. Summary of Process This document provides instructions for replacing the fuse on an MX12 centrifuge. T…

E8 Power Jack Replacement Instructions - SNR-7.5.1-W-023

Purpose This work instruction describes the process to replace a power jack for all versions of the E8 Centrifuge. Required Equipment * Power Jack Cable Assembly; E8 (Part # 100525) * #1 Philips Screwdriver Summary of Process The procedure involves unplugging the unit, removing the rotor and base/motor asse…

MX12 Lid Instruction - SNR-7.5.1-W-022

Purpose This work instruction describes the process for replacing the lid on the MX12 centrifuge unit. Required Equipment * Lid (Part # 100959-F) * Lid Latch Top Plate (Part # 100961-E) * Solenoid Latch Catch (Part # 101078-E) * Hinge Plate (Part # 100960-C) * Machined Screw M4x8mm BHCS SS (Part # 101071) …

MX5 Motor Control Drive Board Repair Instructions - SNR-7.5.1-W-037

Purpose This work instruction describes the process for replacing the Motor Control Board on the MX5 Digital Centrifuge. The instructions apply to boards with part numbers 100918-B for 110V units and 101072 for 220V units. Required Equipment * Motor Control Board (Part # 100918-B for 110V or 101072 for 220V) Su…

E8 Lid Repair Instructions - SNR-7.5.1-W-040

Purpose This work instruction describes the process for replacing the lid of all E8 Centrifuges. Required Equipment * The full list of required equipment is not available in the provided document content. Summary of Process The procedure involves the complete process for replacing the lid on any E8 Centrifug…

Slide Warmer Power Switch - SNR-7.5.1-W-048

Purpose This work instruction describes the process of replacing the Power Switch (100099) on the Slide Warmer. Required Equipment * Power Switch (Part # 100099) Summary of Process This document provides instructions for replacing the power switch on a Slide Warmer. The attached document contains the detailed …